Airport Projects

ARLINGTON MUNICIPAL AIRPORT

LOCATION:  ARLINGTON, TEXAS

CLIENT:  CITY OF ARLINGTON/GRW WILLIS, INC.

CONSTRUCTION COST: $2,600,000

 

The project consists of construction of a new full-length 5000' parallel taxiway, six connecting taxiways, and holding aprons on each end of the parallel taxiway. Drainage improvements include over 5000' of new channels with installation of culverts at nine locations. Grading consists of removal of the existing parallel taxiway as well as runway safety area embankment on the South end. A new South end perimeter road is included in the project, as well as 6800' of new chain-link fencing.  Reconstruction of T-hangar access taxiways is also included.

[Home] [People] [About Us] [Projects] [Services]

Please contact our Webmaster with questions or comments.
© Copyright 2001 . Smith-Western Engineering, Inc. All rights reserved.

079

199808